Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Jul 28, 2022     45-6 Cabin Doors and Transparency Step 1-3 - (2 hours) Category: Fuselage
Prepared the hinges for the right door cutting the AN3-21A bolts to size. Positioned the hinges after squaring up the hinge position in the canopy.
Positioned the hinges in the correct way. The reference left and right is intended looking to the door. Not very clear at the beginning. You need to look very carefully at the drawing to realize the hinges aree some how slightly twisted to accomodate the curve of the canopy.
Once positioned the hinges on the canopy i matchdrilled and installed the first screw. After that i used the reference line and aligned the hinges for the other drilling.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.